Managing construction equipment, machinery and materials: that's why you're losing money!

April 12, 2024
9 min
Payroll calculation CCQ

Many companies face major challenges that hamper their ability to manage their resources effectively. Lack of visibility over the location and availability of resources, inadequate planning and ineffective monitoring are all problems that can lead to considerable wasted time, unnecessary expenditure and, inevitably, delays in site delivery. These are not just logistical hassles, they also represent a major source of financial loss in the construction and civil engineering sectors.

This article explores the roots of these problems and proposes a modern solution: the adoption of resource management software, capable of transforming these challenges into opportunities.

Problems related to the management of equipment and materials

Lack of visibility

In many cases, companies struggle to get a clear picture of the location, quantity and condition of their equipment and materials. This lack of visibility often leads to decisions being made in a hurry, based on guesswork rather than accurate data. This behavior is the gateway to bigger internal problems such as poor communication.

Poor planning

The availability of equipment and materials is not always aligned with the worksite schedule. This can be the result of inadequate planning or poor communication between field crews and inventory management. As a result, projects can suffer delays due to a lack of resources available at the right time. It is essential to take into account the availability of materials already procured, and to plan the purchase of the necessary raw materials at the design stage.

Ineffective follow-up

Tracking the use, location and condition of equipment and materials - concrete, wood, glass, steel, metals, all the materials needed to make buildings - is often done manually or using systems such as Excel. This method of tracking is not only time-consuming, but also prone to errors, making it difficult to accurately assess the lifespan of equipment and plan for its replacement or repair.

These problems have a direct impact on site profitability. Delays in schedules, extra costs incurred by rushing to hire equipment or purchasing materials at higher prices, and premature replacement of poorly maintained equipment are all financial consequences of poor management. What's more, failure to anticipate material requirements can lead to over- or under-purchasing, directly affecting your company's budget and efficiency.

Consequences of poor management

Poor management of equipment, materials and materials has a direct impact on profitability and work efficiency. The impact is felt mainly in lost time and money, as well as project delays, with far-reaching repercussions on reputation and customer satisfaction. The sources of company failure are often either poor financial management or a bad reputation.

Waste of time and money

Inefficient resource management inevitably leads to unnecessary expenditure. For example, the inability to locate the necessary equipment quickly can lead to the rental of an additional machine, incurring unforeseen costs. Similarly, the use of inappropriate equipment or materials can lead to costly repairs or even premature replacement of these resources. These situations are often the result of poor planning and ineffective follow-up, where materials are not available at the right time, or equipment is in an unusable condition, forcing crews to wait for deliveries before continuing with the job.

Project delays

The consequences of poor management are not limited to immediate financial losses. Delays in project delivery have a significant impact on a company's reputation with customers and partners. Each day's delay can mean additional costs in terms of labor and equipment rental, not to mention potential penalties stipulated in contracts. What's more, customer satisfaction is directly affected, which can jeopardize future contract opportunities. These delays are frequently the result of a chain of problems linked to poor resource management, underlining the crucial importance of effective planning and monitoring.

The solution: resource management software

In an industry where the margin for error is minimal and the costs of delays can be astronomical, the adoption of resource management software represents an essential solution for overcoming the challenges associated with materials management. These technologies offer a host of benefits that can transform worksites, making resource management both more efficient and more cost-effective.

4 advantages of using specialized software

The use of materials management software provides complete visibility of equipment and materials inventory, location and condition. This enables project managers to know precisely what is available, where and when, facilitating planning andresource allocation. What's more, this type of system offers real-time tracking capabilities, enabling information to be updated instantly. This reduces the risk of errors and redundancies, while improving responsiveness to the unexpected. Thanks to their properties and characteristics, it's possible to make the right choice more quickly to meet every need, in real time and with full information.

Solving management problems

In terms of visibility, resource management software eliminates guesswork and time-consuming research. With accurate data at their fingertips, decision-makers can make informed choices about the use and purchase of materials, avoiding surpluses or shortfalls that can delay worksites. For planning, these tools can create detailed schedules that incorporate resource availability, ensuring that the right equipment and materials are in the right place at the right time. For monitoring, they generally incorporate reporting and alert functions that inform managers of the status of resources, upcoming maintenance, and any replacement requirements, thus ensuring optimal utilization and extended equipment life. Thanks to this monitoring at every stage of the project, from the design phase through to consideration of various constraints (temperatures, contractors' schedules, etc.), you can manage your projects more effectively and gain greater clarity.

In conclusion, resource management software such as Civalgo offers a robust solution to the traditional management problems specific to this sector. By providing a centralized platform for visibility, planning and tracking, these digital tools can deliver significant savings, avoid delivery delays andimprove their competitiveness in the marketplace.

What's a rich text element?

The rich text element allows you to create and format headings, paragraphs, blockquotes, images, and video all in oneplace instead of havingto add and format them individually. Just double-click and easily create content.

Static and dynamic content editing

bold elementsbeused with static or dynamic content. For static content, just drop it into any page and begin editing. For dynamic content,add a richtext field to any collection and then connect a rich text element to that field in the settings panel. Voila!

How to customize formatting for each rich text

Headings, paragraphs, blockquotes, figures, images, and figure captions can all be styled after a class is added to the richtext element using the "When inside of" nested selector system.

tyhrrthtrhrth

  • fefefefee
Subscribe to our newsletter!
Civalgo © 2023